Projects
Our Projects
Inspiration for Your Next Project
Rockefeller has executed large-scale, technically demanding projects across Botswana since 1999.

Sepopa–Mohembo Road (70 km, Ongoing)
Design & build, cold recycling, shoulder reinstatement, asphalt overlay.

BIUST Access Road & Gatehouse (6 km)
Full construction of gatehouse, boundary walls, ablutions, stormwater systems, street lighting.
Maung Internal Roads (30 km)
Asphalt overlay and rehabilitation.
Mahalapye Wastewater Re-Use Plant
Sewer infrastructure, pump installations, treatment structures, paved access roads.
Mogoditshane Stormwater Drainage (1.2 km)
Concrete lined drainage within residential clusters.
Nkange River Culvert (80 m)
Portal culvert construction, gabions, stone pitching, guardrails.
